Track Record

On-Time and Budget Delivery that Have Been Sold to Global/National Companies
Since 2006, Crossdock has developed warehousing and industrial facilities for international and Fortune 500 companies that include:

  • Logistics
  • Retail
  • Automotive Manufacturing
  • Food Processing
  • Pharmaceutical

A testament to the quality of our facilities and tenants is that many of the facilities have been purchased by Global/National Companies such as:

Track Record – Assets Purchased By Global/National

($ in thousands)
Tenant Facility Type Build Sq. Ft. (2) Leverage Yield on Cost (6) Hold Period (Years) Equity Multiple (7) IRR (7) Sold
Autoneum Auto Manufacturing Build to Suit 448,000 70.0% 7.00% 2.3 1.42x 16.2% ANCIO
Sumitomo Auto Manufacturing Build to Suit 448,000 70.0% 8.82% 1.7 1.72x 38.4% ANCIO
Optum (4) Pharma Build to Suit 107,500 0.0% N/A N/A
Knipper Pharma Build to Suit 412,000 67.9% 7.20% 2.8 1.81x 23.2% Olympus
MedVenture Medical Devices Build to Suit 120,000 80.0% 8.20% 1.0 2.80x 41.2% N/A
The Hut Group Food Grade Spec 210,400 70.0% 7.88% 0.8 1.42x 59.9% ANCIO
Lubrizol, Bose, Shoe Sensation Food Grade/E-Commerce Spec 664,834 70.0% 9.98% 2.3 2.61x 50.9% ANCIO
SRI E-Commerce Spec 572,000 95.0% N/A 1.0 1.80x 44.4% Trade Lane
AEC Zappos E-Commerce Spec 662,300 75.0% 7.22% 2.6 1.84x 22.7% Prologis
Kenco (8) E-Commerce Spec 664,803 53.9% N/A 2.6 1.38x 12.8% Olympus
Amazon (5) E-Commerce/Land Spec 1,016,000 80.0% N/A 2.2 1.91x 22.0% Prologis
BDHM (5) Industrial/Land Spec 50.0% N/A 1.0 1.60x 40.3% 3PL
Census Bureau Government Spec 450,000 90.0% 7.90% 3.2 2.14x 20.9% Exeter
Total 5,767,837   2.0 1.91x 34.3%  
(1) Land and financing close date.
(2) Includes expansion sq. ft., where applicable.
(3) Represents total project cost, including hard and soft costs.
(4) Fee development.
(5) Land and site development; cost representative of land and site development costs.
(6) Calculated based on total initial project cost and first full year of rent.
(7) Project level returns. Calculated assuming 1.5% closing costs; exclusive of any interim period cash flows.
(8) Transaction financed with non-recourse debt. No yield on cost information available - pre-existing contract to be bought out of deal was executed prior to a tenant being put in place.